Today I went to a work site in Durham. I got to help the workers and made sure everything with the project was going well. The project was to install lighting and televisions into office buildings. There were some problems though. A challenge that we ran into was that the wiring was not done properly so we had to redo all the wiring before putting in the lighting. After we overcame some challenges we made sure everything was on check and continued. Overall it was a good work day and I learned a lot. I learned that with work some things will go wrong and a solution is needed.