Day 8: Last Day at SEPI!

On my last day at SEPI Engineering and Construction, I met with Mike Harris, a construction project manager at SEPI. He is currently working on multiple road repair and widening projects around the state. We drove to some of the sites where the road was being widened and he explained to me what they were doing and the procedure used for widening a road. Afterwards, we went to Taco Bell for lunch and I got one of those Doritos tacos that they have. It was pretty good, if I do say so myself!

I didn’t have any pictures from today, so here’s a picture of the main SEPI building lobby.

Leave a Reply

Your email address will not be published. Required fields are marked *

Skip to toolbar