On my last day at LS3P, I was given the opportunity to visit the construction site for Building Q at SAS. I was able to sit down in a meeting filled with construction workers, interior designers, and other architects. I learned that there’s a huge process that goes into building a building as large as the SAS one. They went through a list of things they needed to check up on but it consisted of 15-20 things. Do keep in mind that these are weekly meetings. After the meeting, I was able to go through the construction site and up and down the training center. It was very eye opening because I got a new perspective of how long and tedious it takes to build a building.